Four Mile Run Watershed April Community Meeting
- Reserve
- Details
In 2016, the Pittsburgh Parks Conservancy began work on a plan for green infrastructure improvements in the Four Mile Run watershed. Neighborhoods in the Four Mile Run watershed include Greenfield, Squirrel Hill, Oakland, and Hazelwood.
This project aims to reduce the frequent flooding in the Run, restore the local ecology, and improve park connectivity. In the coming months, our consultants, led by the landscape architecture firm Phronesis, will be working to refine this concept plan through on-the-ground technical surveys, cost analysis, and continuing community engagement.
We will be holding a public community meeting on April 27th from 6-8pm at the JCC in Squirrel Hill. At this multi-community meeting, the design team will be presenting conceptual designs and seeking input from residents in and around the watershed (Greenfield, Squirrel Hill, Oakland, Hazelwood).
Light snacks and refreshments will be provided. Please be sure to register, and to share with neighbors and friends!
- Twitter: @pittsburghparks
- Instagram: @pittsburghparks
Follow the event with #pittsburghparks